Three stages. You decide at every gate.

An engagement starts with a measurement and moves forward only when you say so.

From first survey to a building that runs to plan.

  1. Baseline
  2. Recommend
  3. Optimise
  1. Baseline

    We measure what your building uses today.

    • Site survey and a read-only connection to your BMS
    • Metering audit, with sub-meters added on the central plant
    • Baseline verified and signed off independently under IPMVP
  2. You accept the baseline.

  3. Recommend

    It shows your team the plan before anything acts.

    • Runs live, forecasting and issuing the day's plan
    • Tells rather than does, so you see every call
    • Forecast quality is proven on your own building
  4. You approve the scope it may act on.

  5. Optimise

    It runs the day's plan on the scope you approved.

    • Adjusts in real time
    • Override always available, every action logged
    • Monthly reporting against the verified baseline

Savings you can audit.

Savings are measured against the baseline at each site and verified independently under IPMVP, the international protocol for measurement and verification.

  1. Baseline

    Measured before anything changes, and adjusted for weather, occupancy and tariff.

  2. Measure

    The same meters record what the building uses once the twin is running.

  3. Verify

    The difference is checked independently and reported every month.

What we need from you to get started.

  • BMS points and drawings

    So we know what can be read and what can be run.

  • Asset registers

    With installation and replacement dates.

  • Three to six months of invoices

    To check the model against the real bill.

  • A date for the site survey

    We walk the plant rooms with your facilities team.

Email this list

The commercial terms are structured to suit the site.

Every building is different, so terms are agreed once the assessment shows what is worth doing.

Questions people ask.

Who stays in control?
You do. It starts read-only, then recommends. It acts only on the scope you approve, every action is logged, and override is always there.
How do we know the savings are real?
A baseline is measured before anything changes. Savings are measured against it at each site and verified independently under IPMVP.
How is our data protected?
The connection starts read-only, with no control path into your systems. Your security team reviews it before anything connects.
How long before we see results?
It moves in three stages: a measured baseline, then recommendations, then optimisation. You approve each step, and the timing is agreed in the assessment.
What does it cost?
It is structured to suit the site. The assessment shows what is worth doing, and the commercial terms follow from that.

Find out what your building could save.

A site assessment starts with a survey and ends with a measured baseline.

Book a site assessment